We use necessary cookies to run the site. With your consent we will also use analytics (Google Analytics) and marketing cookies to tailor our offer. You can change your choice at any time in the footer. Privacy policy
Three and a half minutes from the plant in Zahutyń near Sanok, Poland. From the log on the storage yard, through the sawmill and the flange forming lines, to drum assembly and loading onto the trailer.
3:36A film from the plant in Zahutyń: the sawmill, flange forming lines, assembly and loading of cable drums.
Pine from Subcarpathia reaches our own sawmill. Cutting, grading and preparing the material for flanges and core staves.
The forming line cuts the flanges to diameter and drills the axle bore, the holes for tie rods and the driver holes.
Core staves, tie rods, bolting the structure together. The drum is built to the dimensions agreed with the customer.
IPPC / ISPM 15 marking, documentation and loading onto the trailer. From here the drums travel to cable plants across the European Union.
Size it in the configurator and download a drawing with the full specification, or write to us with your own factory drawing.